• Project Name: Refinery Project

In this project, the Rope Access team was responsible for carrying out inspection, maintenance and repair operations in high and difficult to reach areas of the refinery. The use of the Rope Access method eliminated the need for scaffolding, resulting in significant time and cost savings. All activities were carried out in accordance with HSE standards and IRATA international guidelines to ensure the highest level of safety, quality and sustainability of operations.